
|
|
| 2008 |
|
 |
Supply, installation and commissioning of two main components: Precision Approach Path Indicator for both runways with dual CCR system, and cabling interconnection and Wind Mast and wind socket on both runway directions along with all necessary and associated civil works.
|
 |
Design, supply, installation and commissioning of a new public address system / voice evacuation system in fire stations at Abu Dhabi airport. |
 |
Supply Abu Dhabi International Airport with Searidge Technologies' IntelliDAR™ system for advanced surface surveillance. |
 |
Doha Qinetiq project: project management, Installation & civil work for three TARSIER FOD radar systems (Foreign Object Detection radar) at the present Doha International Airport. |
 |
Delivery of Frangible Masts ( according to ICAO Aerodrome Design ) to be used at Dubai International Airport & JXB airport. The supply of these frangible mast to help DCA obtaining CAT III certificate, whereas all Navaids masts within the range of 120M from centerline to be replaced into frangible masts. |
 |
MALMS – mobile Airfield Lighting Monitoring system for Abu Dhabi Airport. |
 |
Complete Fiber Optics Network for the Airfield Ground Lighting system at Abu Dhabi. |
 |
Installation of the Visual Docking system manufactured by Safegate for Abu Dhabi Airport. |
| 2007 |
|
 |
Installed NDB at Al-Khor (50 kms away from Doha) training airport in Qatar. |
 |
Supply and installation of ILS & NDB (Non-Directional Beacon) in Runway 16 - Doha International Airport - Qatar. |
 |
New Etihad Terminal - Abu Dhabi International Airport : Supply, Installation, commissioning and Warranty of the following airport systems:
- Baggage Reconciliation Systems (BRS)
- Common Use Terminal Equipment ( CUTE)
- Public Address Systems & Voice Alarm ( PA/VA)
- Master Clocks Systems (MCS)
- Master Antenna Television (MATV)
- Local Area And Wireless Network
- Structured Cabling System for all the above systems.
|
 |
Supply, Installation, Testing and Commissioning of UHF/VHF Radio Equipments - Abu Dhabi International Airport |
 |
Design, Installation and Supply of UHF/VHF Radio system - Jebel Ali International Airport |
 |
VCCS system and control equipment - Jebel Ali International Airport |
 |
Design, Supply and Installation of Ground Movement Guidance, multi-laterations systems - Jebel Ali International Airport |
 |
Terminal 1: Upgrade of the Flight Information Displays Systems - Abu Dhabi International Airport |
 |
Qinetiq: Project Management, Installation and Warranty for Tarsier Radar System (Foreign Object Detection Radar) - Dubai International Airport |
 |
Supply , install and commission the MALMS mobile airfield lighting calibration system including a photometric bench - Dubai International Airport |
 |
Design, Fabricate, Supply, Installation, Training , Spare Parts, Testing, Commissioning and Flight Check Assistance of 2 ILS/DME catIIIB (Instrument Landing System, Distance measurement Equipment) - New 2K Runway part of the Expansion Plan of Abu Dhabi International Airport |
 |
Modification of Dubai Airport Royal Wing Baggage handling System. Rebuilding of the Royal Wing Belt system to simplify operation from an S shaped system to a C shaped system and adjusting the necessary controls to enable all the belts to run at similar speed, integration with the X-ray Machine and Building monitoring system - Dubai International Airport - Royal Wing |
 |
Electrical Power supply for the NAVAIDS buildings - Doha International Airport - Qatar |
| 2006 |
|
 |
Turnkey project : Instrument Landing System Cat IIIB - Jebel Ali International Airport |
 |
Turnkey project : Instrument Landing System for the South Runway - Dubai International Airport |
 |
Upgrade and Expansion of Air Traffic Control Simulator - Dubai International Airport |
 |
Digital end to end Communication Systems for new ATC centre of GCAA - General Civil Aviation Authority |
| |
|

|
Abu Dhabi International Airport |
| 2007 |
|
 |
Replace the CRT by new TFT Displays and Upgrade the System Configuration |
| 2006 |
|
 |
Upgrade of the Flight Information Display System Database |
 |
Replacement of CRT displays by TFT for the FIDS System |
| 2005 |
|
 |
Turnkey Project : Passanger Handling, Departure Control and Baggage Reconcilation Systems (DCS, BRS, PH) |
 |
Turnkey Project : Special Systems for T2 & T1A (DCS, FIDS, Public Address) |
| 2004 |
|
 |
Supply & Installation of an Airfield Lighting Calibration System |
 |
Supply & Installation of Fibre Optic Bakcbone for Radar and Navigation Systems |
| 2003 |
|
 |
Interactive TV system for the Airport Hotel |
 |
Supply & Installation of Communication Systems for the Emergency Control Tower: Radios, VCS, Recorders, ATC Console … |
| 2002 |
|
 |
Supply & Installation of Meteorological Information Display Systems |
 |
Renewal and Development of Navigationl Aids Systems: ILS, DME, RVR, Radios |
 |
Refurbishment of FIDS system |
| 1999 |
|
 |
Turnkey project: Flight Information Display System (FIDS) |
| |
|
|
Al Ain International Airport |
| 2006 |
|
 |
Turnkey project : Instrument Landing System Cat IIIB - Jebel Ali International Airport |
| 2005 |
|
 |
Turnkey Project : Passanger Handling, Departure Control and Baggage Reconcilation Systems (DCS, BRS, PH) |
| 2004 |
|
 |
Supply & Installation of Fibre Optic Bakcbone for Radar and Navigation Systems |
| 2000 |
|
 |
Turnkey project : Flight Information Display System (FIDS) |
| |
|
|